Lucien-L'Allier station - Large image

Ligne 2 orange LUCIEN-L’ALLIER

Architect

Architects

Jacques David, Pierre Boulva, Erwin Cleve1
Commuter train station (1996): Lemay et associés, LeMoyne Lapointe Magne2
Commuter train platform canopies (2024): Les Architectes FABG3

Inaugurated

Start of service

April 28, 1980
Commuter train station: March 18, 19964

Art & Architecture

Despite its modest appearance from the outside, the great height of the walls and the vaulted ceilings of this exceptionally deep station lend it the appearance of a towering ancient monument or an austere modern cathedral.

Panorama of the second landing and the towering volume above it. At left, a row of massive arches separates the escalator well between this landing and the ticket hall level. The second landing and the lofty volume above it; in the background, the imposing arches separating this volume from the escalators to the ticket hall. At centre, a technical facility is seemingly suspended in the open light and air shaft.

The soaring walls, vaulted ceilings, great arches, and massive, plain-lined forms loom over the passenger, while the volume permits a direct line of sight nearly seven storeys down through a central light shaft from the entrance down to the ticket hall. The brown brick walls provide a feeling of warmth and link the upper spaces to the plain platform level.

The station's unremarkable headhouse, located next to the abutment along the train station's platforms. Behind the headhouse is the enclosed passageway leading to the train station. The train station’s platform canopies are visible in the background. Interior of the headhouse, featuring a barrel-vaulted ceiling. At right is the glass-enclosed ventilation and light shaft and the bridge giving access to the passageway to the train station.

The station consists essentially of a deep rectangular volume excavated at the eastern end of a trainroom built in tunnel. The nondescript headhouse stands atop this volume. From there, a flight of stairs and escalators descends to a first landing with low, vaulted ceilings, featuring a concession.

The low-ceilinged first landing, not far below street level. The comparatively low, barrel-vaulted ceiling of the first landing.

The next flight of stairs confronts passengers with the full monumental scale of the volume, as they enter the towering space above the second landing. Along their way, they pass under the first of a row of massive arches that support the headhouse.

Panorama looking down on the second landing and the volume above it, seen from the stairs coming down from the first landing. Above, the volume admitting light and ventilation from the surface is crossed by a glassed-in bridge connecting the headhouse entrance with the passage to the commuter train station. The headhouse overlooks the volume through the windows nearby. Above right, the mouth of a ventilation shaft is camouflaged by a sculptural grille by Jean-Jacques Besner. In the background, the stairwell to the ticket hall is separated from the main volume by large archways. Panorama of the second landing. Above, the sculptural grille by Jean-Jacques Besner covers the mouth of a ventilation shaft. At left, large archways separate this volume from the stairwell leading down to the ticket hall.

A third flight of stairs reaches the ticket hall level, equally monumental in scale. The architecture on this level also reveals an angular central core, containing technical facilities, that connects with the different levels of the volume.

The ticket hall level and the volume overhead, seen from the foot of the escalators heading up. The ticket hall with the central light and air shaft above. Beside the ticket booth, an angular central core containing technical facilities rises up to connect the different levels of the station. The rear of the stairwell between the first and second landings hangs over the access to the platforms.

From the fare-paid zone, short staircases connect to the eastern end of the platforms. While the trainroom lacks the grandeur of the upper levels, its plain decor is visually connected with theirs, through the use of the same brown bricks on the walls.

The comparatively small volume hosting the stairs between the ticket hall and platforms. The station's trainroom, built in tunnel, looking westward from the Côte-Vertu platform.
Detail of the station's Côte-Vertu platform, looking east. The platform benches are surfaced in terracotta tiles; the walls share the same warm brown brick as the upper parts of the station.
Panorama of the trainroom from the Côte-Vertu platform. The stairs to the ticket hall are at left.

In the mid-1990s, the construction of the Molson (now Bell) Centre and the Windsor commuter train terminus (now Gare Lucien-L’Allier) led this previously underused station to drastically change its vocation. As a result, it underwent several modifications. An enclosed, above-ground pedestrian walkway between the station’s headhouse and the new complex was built along the train tracks over Rue de la Montagne. The walkway is largely in glass and metal, and looks out onto the train station’s platforms.

Connection between the passage to the commuter train station (right) and the metro station headhouse (left). The passage to the train station, looking back toward the connection to the metro. The passage runs along the outside edge of the headhouse; the barrel vaults of the headhouse's concrete roof are visible here. The above-ground connection between the metro and commuter train stations runs along and overlooks the train tracks (right). A mural by Cam Harapiak runs along the wall (left).

The passageway was connected to the headhouse via a bridge running through the top of the light shaft. Unfortunately, this has reduced the visibility of the metro station’s artwork, a sculptural grille by Jean-Jacques Besner which conceals a ventilation opening. It can still be seen from below, in the station’s volume, and through internal windows in the headhouse.

A textured sculptural grille by Jean-Jacques Besner, seen from the second landing, covers the opening of an air shaft. The transept added to the far (western) end of the trainroom in the 1990s to give access to an emergency exit. For fire safety reasons, the overlook from the ticket hall onto the platforms was enclosed by glass bricks and panels in preparation for the connection with the Bell Centre and commuter train station.

Other modifications concerned the fire safety requirements of the anticipated surge loads produced by the commuter train and especially following matches and other events at the arena.

Fortuitously, the station’s original design had included space at the far end of the platform to give the option for a second access to be built. The fire safety renovations used this space to construct a bridge and emergency exit. It runs below the Ville-Marie Autoroute and the train tracks and exits onto Rue Saint-Antoine.

A glass screen was also built dividing the station volume from the platforms, to prevent the propagation of smoke.

Panorama of the platforms and terminal tracks serving the commuter train station, taken from platform 7/8. Each island platform serves two platform faces. The platforms are sheltered with long wood and glass canopies, supported on white Y-shaped pillars marked with the “o” from the Exo logo. At right, sliding doors lead into the station house. In the background, the connection between the commuter train and metro stations runs alongside the tracks; Rue de la Montagne is visible through the glass, showing that the ends of the tracks and platforms occupy a viaduct over the street. Panorama of the platforms and terminal tracks serving the commuter train station, taken from platform 3/4 and looking back toward the station house and Bell Centre.

The commuter train station hosts no fewer than four open-air island platforms serving eight tracks, partially sited on viaducts over Rue de la Montagne and Rue Lucien-L’Allier; the longest platform is over 340 metres long. The platforms were completely rebuilt in 2024, with the addition of long wood and glass canopies supported on white Y-shaped pillars.

Panorama along the commuter train platforms, seen from platform 1/2. The train station house, integrated into the ground floor of the Bell Centre, is at left. Unfortunately, the new canopies (seen here less than a year after they were installed) have already been blackened by the train locomotives’ diesel exhaust.

However, the station house itself is a relatively small and fairly cramped and cluttered waiting area stuck on the west side of the Bell Centre.

Panorama of the interior of the commuter train station, on the ground floor of the Bell Centre, facing the sliding doors leading out to the platforms. The exit to Avenue des Canadiens-de-Montréal and the connection to the metro station are at right; the exit to Rue Saint-Antoine is at left.
Looking south along the length of the commuter train station interior, toward the ticket booth and Rue Saint-Antoine exit. The two-storey space features exposed columns and ductwork and additional daylight is provided by clerestory windows. At left is a Montreal Canadiens souvenir store. The exit onto Avenue des Canadiens-de-Montréal, with the access to the metro station rather obscured at left. Sliding doors lead to platform 3/4.

Formerly, a spacious forecourt welcomed passengers and advertised the station’s presence. However, a condominium tower has since been built on it, leaving the main entrance obscured underneath an overhang. A second entrance, on Rue Saint-Antoine, reaches the station via a steep, narrow staircase. The waiting area also connects to a passage leading to the entrances to the arena and to the underground city to the east.

The forecourt of the commuter train station is now occupied by a condominium tower, obscuring the presence of the station, which is not indicated by any signage. Entrance to the commuter train station, obscured underneath the overhang of the condominium tower. At right, Rue de la Montagne passes under a viaduct which carries the station tracks and the passage to the metro station.
The southwest corner of the Bell Centre rises over Rue Saint-Antoine. At the corner, an entrance provides access to the commuter train station. The viaduct carrying the tracks is seen above Rue de la Montagne at left. The narrow staircase leading to the commuter train station from Rue Saint-Antoine. Interior of the commuter train station, with its ticket booth (centre-left); at right, a corridor gives access to the Bell Centre and to the underground city beyond.

In 2023, a graffiti-style mural by Cam Harapiak was added to the walkway between the metro and commuter train station, to commemorate the Montreal Canadiens near their home ice at the Bell Centre. The 42-metre-long, seven-section mural features the team colours, its logo, and the names of its most famous players.

The portion of the connecting passage between the metro and train station running alongside the tracks features a graffiti-style mural by Cam Harapiak commemorating the Montreal Canadiens and their most famous players. Panorama of the mural by Cam Harapiak in the passage to the train station, commemorating the Montreal Canadiens and their most famous players.

Accessibility

The metro station is not currently wheelchair-accessible. No plans to install elevators have yet been announced.

According to the Plan de développement d’accessibilité universelle de la STM 2012-2015 (p. 40), the predicted complexity of adding elevators at this station was rated as problematic.

The commuter train station is accessible from street level at Avenue des Canadiens-de-Montréal and via an elevator from Rue Saint-Antoine. However, the commuter trains themselves on the lines it serves are not currently accessible.


History & Trivia

Traffic

Ridership

2,273,881 entrances in 2025

46th busiest station

Note: Metro only

Interstation distances

Interstation Distances

To Georges-Vanier: 530.60 metres
To Bonaventure: 381.60 metres

Origin of the Name

Rue Lucien-L’Allier. Lucien L’Allier (1909-1978), engineer and director of public works for the City of Montreal, was the chief engineer for the construction of Île Notre-Dame and the enlargement of Île Sainte-Hélène for Expo 67. He also served as the president of the Montreal Transit Commission starting in 1964, and of the Montreal Urban Community Transit Commission from its creation in 1970. During his tenure, he served as chief engineer for the initial network of the metro.

Due to his vital contributions to the urban fabric of Montreal, Rue de l’Aqueduc north of Rue Notre-Dame was renamed in his honour on February 1, 1979, so as to permit this station to take his name as well.

Since the commuter train station replaced the former terminus at Windsor Station, which had been disconnected from the rail lines by the construction of the Molson (now Bell) Centre, it was initially named Terminus Windsor. However, this proved confusing since the original Windsor Station still exists as an architectural monument nearby; accordingly, on January 1, 2002, Terminus Windsor was renamed Gare Lucien-L’Allier to match the metro station.

Name during planning phase: Aqueduc.5

Lucien L'Allier

Lucien L’Allier
(Source6)

Trivia

  • At 27.1 metres, this is the third deepest station in the metro network. However, since the two deeper stations (Charlevoix and Berri-UQAM) have upper platforms at a shallower level than the platforms here, Lucien-L’Allier is the station where a passenger must traverse the greatest vertical distance before getting to any platform.
  • This station was originally supposed to be decorated with a mobile suspended in the main volume, also by artist Jean-Jacques Besner, but this plan was withdrawn for safety reasons.7
  • The arches in the station’s volume were designed as references to the arches of Roman aqueducts, playing off the planned name Aqueduc.8
  • The station was planned to allow several additional accesses to be added. The existing access shaft at the east end of the station was designed to receive two additional accesses: one east of the station, which would have connected at the level where the concession is located, and one south of the train tracks, which would have connected to the present ticket hall.5 At the west end of the station, as mentioned above, a volume was built to allow an additional ticket hall and transept to be added; this could have connected to an access either south of the station5 or north of it, on Boulevard René-Lévesque.9
A 1976 BTM map of planned extensions showing the station’s name as Aqueduc.

A 1976 BTM map of planned extensions showing the station’s name as Aqueduc
(Source10)

Architectural sketch of the ticket hall.

Architectural sketch of the ticket hall
(Source5)

A 1978 city planning map showing the possible construction of an access to Boulevard René-Lévesque from the western end of the station.

A 1978 city planning map showing the possible construction of an access to Boulevard René-Lévesque from the western end of the station
(Source9)

The inauguration ceremony for the station on April 28, 1980.

The inauguration ceremony for the station on April 28, 1980
(Source11)

The ticket hall soon after the station's inauguration, before the construction of the glass barrier between the ticket hall and platforms

The ticket hall soon after the station’s inauguration, before the construction of the glass barrier between the ticket hall and platforms
(Source11)

The overlook in the headhouse as it was originally designed, with half-height barriers rather than full-height windows, with Jean-Jacques Besner’s sculptural grille in full view.

The overlook in the headhouse as it was originally designed, with half-height barriers rather than full-height windows, with Jean-Jacques Besner’s sculptural grille in full view
(Source12)

  • Commuter train service to the original Windsor Station was discontinued as of October 12, 1993, in preparation for the construction of the Molson (now Bell) Centre, which was to disconnect it from its rail lines. Between that date and the opening of the permanent Terminus Windsor (now Gare Lucien-L’Allier) on March 18, 1996, a temporary wooden building served passengers. It was demolished in April 1996.4
Façade of the train station bearing the former name Terminus Windsor

Façade of the train station bearing the former name Terminus Windsor

The train station's forecourt before the construction of the Tour des Canadiens

The train station’s forecourt before the construction of the Tour des Canadiens

Temporary staircase providing access to the passageway to the metro station from Rue de la Montagne in 2014, during construction of the Tour des Canadiens

Temporary staircase providing access to the passageway to the metro station from Rue de la Montagne in 2014, during construction of the Tour des Canadiens

The commuter train station before its renovation and the construction of canopies in 2024.

The commuter train station before its renovation and the construction of canopies in 2024

Commemorative plaque in honour of Lucien L'Allier, in the uppermost landing

Text of the commemorative plaque displayed on the station’s uppermost landing:

Lucien L’Allier
Engineer
1909-1978
Director of public works for the City of Montreal, chief executive officer of the Commission du transport de la Communauté urbaine de Montréal, he was the original director of the construction of the metro, distinguishing himself as a state official and a faithful servant of his fellow citizens.

General Information

Platform diagram

Most convenient metro cars to use when travelling to this station

Platform diagram - Lucien-L'Allier station

Station surroundings

Lucien-L'Allier - Station surroundings

Station address

Borough of Ville-Marie
Metro station:
955 Rue Lucien-L’Allier, at Rue Argyle

Commuter train station:
North entrance: 1290 Avenue des Canadiens-de-Montréal, at Rue de la Montagne
South entrance: 1275 Rue Saint-Antoine Ouest, at Rue de la Montagne

OpenStreetMap link
Google Maps link

STM neighbourhood map (PDF)

Underground city connections

Nearby attractions

Official website

Service information, opening hours, frequency, bus routes

STM logo
exo logo
Lucien-L'Allier station - Underground city
Underground city diagram legend

Most recent update: October 14, 2026

References
  1. "David, Jacques." (n.d.) Répertoire du patrimoine culturel du Québec. Ministère de la Culture et des Communications du Québec. ↩
  2. "Centre Bell." (2013). Lapointe Magne & associés. ↩
  3. "EXO – Gare Lucien-L'Allier." (n.d., c. 2024). Les Architectes FABG. ↩
  4. Leduc, Michael. (1996). Montreal Island railway stations: CP & constituent companies. Dollard-des-Ormeaux, QC: Michael D. Leduc. ↩ ↩
  5. David Boulva & Cleve, architectes. Station Aqueduc (presentation document for the Bureau de transport métropolitain). 1973. Archives de la Ville de Montréal, dossier CA M001 XCD001-D19, item 1D-06-01-10F. ↩ ↩ ↩ ↩
  6. Source: Archives de la Ville de Montréal, VM94-Z863-02. Used under the Creative Commons BY-NC-SA 2.5 CA License. ↩
  7. Clairoux, Benoît. (2002, November 6.) “Les secrets des stations de métro.” En Commun, vol. 12, no. 18, p. 3. ↩
  8. Société de transport de Montréal. (n.d.) “Lucien-L’Allier (Jean-Jacques Besner).” STM. ↩
  9. Ville de Montréal, Service de l’urbanisme. (1978, September 15.) Station Lucien-L’Allier [planning map]. Archives de la Ville de Montréal, CA M001 VM166-1-1-D5311, p. 3. ↩ ↩
  10. Image source: Gaston, J. (1976.) Le métro de Montréal. Montreal: Bureau de transport métropolitain. ↩
  11. © STM archives. ↩ ↩
  12. Image source: Bureau de transport métropolitain. (n.d.) “Lucien-L’Allier” [pamphlet]. ↩